Home > EMC > EMC Certification > e20-817

e20-817 Exam : Symmetrix Business Continuity Expert Exam for Storage Admins

pass4side e20-817

Exam Number/Code : e20-817

Exam Name : Symmetrix Business Continuity Expert Exam for Storage Admins

Questions and Answers : 519 Q&As

Price : $ 89.00

Update Time : 2009-12-02

pass4side e20-817 Exam Features

pass4side has assembled to take you through 120 Q&As to your e20-817 Exam preparation. In the e20-817 exam resources, you will cover every field and category in e20-817 helping to ready you for your successful Juniper Certification.

Quality and Value for the e20-817 Exam

pass4side Practice Exams for EMC e20-817 are written to the highest standards of technical accuracy, using only certified subject matter experts and published authors for development.

100% Guarantee to Pass Your e20-817 Exam

If you prepare for the exam using our pass4side testing engine, we guarantee your success in the first attempt. If you do not pass the EMC Certification e20-817 exam (Symmetrix Business Continuity Expert Exam for Storage Admins) on your first attempt we will give you a FULL REFUND of your purchasing fee AND send you another same value product for free.

EMC e20-817 Downloadable, Printable Exams (in PDF format)

Our Exam e20-817 Preparation Material provides you everything you will need to take your e20-817 Exam. The e20-817 Exam details are researched and produced by Professional Certification Experts who are constantly using industry experience to produce precise, and logical. You may get questions from different web sites or books, but logic is the key. Our Product will help you not only pass in the first try, but also save your valuable time.

 
 
Exam : EMC E20-817
Title : Symmetrix Business Continuity Expert Exam for Storage Admins


1. Click the Exhibit button.
During the design process of a Star implementation, a customer expresses the intention to switch production to one of the target sites as part of a disaster drill. After the production has been switched, the customer wishes to run Star protection at this site.
What should you advise?
A.It does not matter which site the customer switches production to, because Star protection cannot be enabled when the workload is running at a target site.
B.Servers and management hosts may be provided at either site, because Star protection can be enabled while the workload is running at either target site.
C.Servers and management hosts should be provided at site B, because Star protection can only be enabled if the workload is switched to the Synchronous target site.
D.Servers and management hosts should be provided at site C, because Star protection can only be enabled if the workload is switched to the Asynchronous target site.
Answer: C

2. Click on the Exhibit.
In an SRDF/Star implementation, the Connected state indicates which condition has occurred?
A.Both links are transmitting data, but one or both target sites are not fully synchronized with the workload site
B.The RDF relationship is not properly defined or there is no data flow between the sites.
C.The RDF relationship is properly defined, but the target site in question is not synchronized with the workload site and there is no consistency protection for the remote data.
D.The RDF relationship is properly defined, dependent write consistency of the data at the synchronous target site is assured through RDF-ECA and dependent write consistency at the asynchronous target is assured through MSC.
Answer: A

3. A company has a five-node MSCS cluster running SRDF/CE with three nodes at the primary site and two nodes at the secondary site. The sites are 10 km apart. Due to capacity requirement changes, additional storage is needed.
What must be done to the cluster after the storage configuration changes?
A.No action is required with MSCS after storage provisioning. All storage configuration updates are propagated automatically via the COM server to the cluster nodes.
B.SRDF/CE cluster requires use of the COM server that must be restarted after all configuration changes. Once a change is made to a node configuration, it will send out a message to all other cluster node members after the service restarts.
C.The clusters must be rebooted, and a complete rescan of the system bus is required. Any current patches should be applied at this time.
D.Update the SRDF/CE database by issuing a Symmetrix SRDF/CE Discover through the console or manually setting symcli_db_file to srdfcesymapi.db followed by the symcfg discover command.
Answer: D

4. A customer has a 5 (five) node Microsoft cluster (MSCS) that spans across 2 (two) sites over a SRDF/A link. Site A, the primary site, contains 3 (three) nodes. Site B, the remote site, contains 2 (two) nodes. If the customer is using SRDF/CE with Majority Note Set (MNS), what happens to the nodes at Site A if communication is lost between the 2 (two) sites?
A.Nodes at Site A and Site B will go offline until communication resumes to Site B. The nodes at both sites need to be started manually, and the /ForceQuorum switch must be used.
B.Nodes at Site A will go offline until communication resumes to Site B. The nodes at Site A need to be started manually and the /ForceQuorum switch must be used.
C.Nodes at Site A will go offline until the nodes at Site A are manually started and the /ForceQuorum switch is used.
D.Nodes will remain online.
Answer: D

5. Your client has 10 large Microsoft Exchange servers. Currently, the backups to tape are not completing in the backup window. The database cannot be stopped, and the client has no capacity to increase the number of tape drives available.
How will you help solve the clients problem and provide the shortest possible backup window?
A.Add local BCVs to the Exchange Server disk and use TF/EIM to perform parallel backups.
B.Replicate the data to a disaster recovery site and use TF/SIM to perform tape backups.
C.Use TF/EIM to perform parallel backups directly to tape.
D.Use the EMC EDM product to call the Microsoft Exchange Online Backup API to back up the data to tape.
Answer: A

6. Click the Exhibit button.
The diagram shows a planned Star configuration with two Symmetrix arrays at each site. The options file to be used for setting up Star is shown on the left.
RDF Groups 5 and 6 on arrays A1 and A2 connect to arrays B1 and B2.
RDF Groups 15 and 16 on arrays A1 and A2 connect to arrays C1 and C2.
RDF Groups 55 and 56 on arrays B1 and B2 connect to arrays C1 and C2.
Which RDF groups in the configuration should be assigned the name SiteB?
A.5 and 15
B.5 and 6
C.55 and 56
D.6 and 16
Answer: B

7. Your customer requests an immediate point-in-time copy of their production Oracle database but cannot have the application brought down.
Which Enginuity feature allows the creation of restartable copies without quiescing the database?
A.Double Checksum
B.Enginuity Consistency Assist
C.Multi-Session Consistency
D.Symmetrix Differential Data Facility
Answer: B

8. A customer running SRDF/Star experienced a workload site failure. Production was switched from the workload site A to the synchronous target site B. Some time later, site A came back online. Before switching production back to site A, a symdev show command is executed to examine the R1 devices at site A.
What is the RDF configuration state that describes the relationship of the RDF devices between A and B?
A.Duplicate
B.Half
C.Normal
D.Partitioned
Answer: A

e20-817 Downloadable, Interactive Testing engines

We are all well aware that a major problem in the IT industry is that there is a lack of quality study materials. Our Exam Preparation Material provides you everything you will need to take a certification examination. Like actual certification exams, our Practice Tests are in multiple-choice (MCQs)

Our EMC EMC Certification e20-817 Exam will provide you with exam questions with verified answers that reflect the actual exam. These questions and answers provide you with the experience of taking the actual test. High quality and Value for the e20-817 Exam:100% Guarantee to Pass Your EMC Certification exam and get your EMC Certification Certification.

e20-817 Exam News